Topographic control with DGPS of the sublacustrine laying of the 26 "gas line between Bajo Grande and Ulé

Client
Location

Costa Oriental del Lago de Maracaibo. Venezuela

Date

30/01/2016

Technical Sheet

Description

El proyecto se basó en el levantamiento de mediciones GPS de la línea base para realizar el control Topográfico del hincado de 36 pilotes.

Survey of the final position of the piles (As Built), by classical method of topography. The information acquired in the field was processed, generating the respective plans and report.