Route studies for the Barbacoa - Margarita Gas Pipeline

Client
Location

Mar Caribe. Venezuela

Date

17/03/2014

Technical Sheet

Description

The objective of the project was to determine the presence of pipes. For this, several exploratory lines were carried out using equipment such as Sub-bottom Profiler, Side Scan Sonar and Magnetometer.

Finally, a mesh of 3 lines in the north-south direction and three lines in the east-west direction was made, for an approximate total of about 120 linear km.